HomeServices › Egress Windows & Bedrooms

Egress Windows and Basement Bedrooms

A rec room and a bedroom are not the same request, and the difference is egress. You can frame a room downstairs, drywall it, carpet it, and put a bed in it, and none of that makes it a bedroom in the eyes of a building department or, later, an appraiser or a buyer. A sleeping room below grade generally requires an opening someone can get out of, and a firefighter can get in through, without going up the stairs. That one requirement drives the entire project.

In most Utah houses, no existing basement window qualifies. The typical builder window is a small unit set high in a poured concrete wall, and enlarging it is not a window swap. It is a concrete cut, a new header, an excavated window well, drainage for that well, and a way to climb out. The exact dimensions and details that qualify are set locally, and your contractor and your city building department confirm them for your address before anyone starts cutting.

What egress work involves

  • Bedroom feasibility check Which walls face usable grade, where the well can go, and whether a room in that corner of the basement can become a legal bedroom at all.
  • Cutting the concrete opening Saw cutting the foundation wall to the required opening size, with shoring and a header so the wall above the new opening stays supported.
  • Excavation and window well Digging outside the new opening and setting a well sized for the window, which is where most of the mess and the landscaping impact lands.
  • Well drainage A drain or gravel base so the well does not fill during spring melt or a hard rain and push water at the new window you just installed.
  • Window, ladder, and cover Setting the egress unit, providing the required means of climbing out, and fitting a cover if you want one, chosen so it still opens from inside.
  • Interior framing and finish Framing the room around the new opening, finishing the jamb and trim, and handling the electrical and heat the room needs to work as a bedroom.

How a basement bedroom gets built

  1. Decide which rooms are bedrooms Say it out loud early. A room called an office on the plan and used as a bedroom later is the most expensive way to discover you needed an egress opening in that wall.
  2. Confirm what qualifies with the city Opening size, well size, and the way out are set locally. Your contractor confirms the specifics with your building department before the plan is finalized or a saw comes out.
  3. Cut, shore, and excavate The wall is cut and supported, the exterior is dug out, and the well is set. This is the loud, dusty, disruptive stretch, and it is usually short.
  4. Set, drain, finish, inspect The window goes in, the well gets its drainage and backfill, the interior gets framed and finished, and the work is inspected as part of the permit.

What it costs

Egress cost is driven by the wall and the dirt, not the window. Cutting poured concrete costs more than cutting block, and a deeper basement means a deeper well and more excavation. Access matters: a wall the equipment can reach is cheaper than a side yard with a fence, a gas meter, and a neighbor right there. Utility lines, a patio, or mature landscaping in the way all add work. Then the interior side has its own cost, because the room around the opening still needs framing, heat, electrical, and finish. Adding two bedrooms means two openings, and the second one is rarely half the price of the first.

Questions people ask

Can I call it a bedroom if it has a closet but no window?

Not honestly, and not on a permit. The closet is not what makes a bedroom, the way out is. A below-grade sleeping room generally needs an egress opening, and a room without one is a den, an office, or a bonus room. It also tends to be corrected later, at your expense, when the house is sold or refinanced.

Does an egress window have to be cut into concrete?

Only when no existing opening qualifies, which is the usual case in Utah. Some homes have a walkout or daylight basement where a door or a large existing window already provides a way out, and then the job is much smaller. The walkthrough answers this quickly, by looking at grade on each side of the house.

Will the window well flood?

Not if it is drained and backfilled correctly, which is the whole point of doing it right. A well with no drainage becomes a bucket against your foundation during spring runoff. If you already have wells that hold water, deal with that before you add another opening, because you are about to put a window at the bottom of it.

Can an egress window be added after the basement is finished?

Yes, and it happens often, usually when someone realizes the room they use for sleeping does not qualify. It costs more after the fact, because finished wall, flooring, and sometimes cabinetry come apart to reach the concrete. If a bedroom is even a maybe, put the opening in during the original project.

Get Help With This

Takes about a minute. No obligation.

We will call you back at the number you give us. Your details go to us and to the provider we match you with, and nowhere else.

Also Available

Other Basement Services

Basement Finishing

The full build across the whole footprint: framing, electrical, plumbing, mechanical, insulation, drywall, and finishes. Sequencing matters more than style here, because the rough-in inspections have to pass before a single sheet of drywall goes up and hides the work.

Learn more →

Basement Bathrooms

Everything downstairs depends on where your main sewer line sits. Above the basement floor, and you are looking at a pump system instead of gravity drainage, plus venting that has to be routed up through the house.

Learn more →

Basement Apartments & Suites

A separate entrance, a kitchen, egress in every bedroom, and parking all enter the conversation. Whether an accessory apartment is allowed at your address, and on what terms, is decided by your city and nobody else.

Learn more →

Partial Finishing & Basement Remodels

Finish half the basement now and leave the rest open, or gut a basement that was finished decades ago. Both are common here, and both start with what is behind the existing walls and under the existing floor.

Learn more →
Powered byTHNK